Tools

Schematic and layout review checklist

What to look at when reviewing a schematic and board layout, for teams running their own reviews. Work through it once at the schematic stage and again when layout is done, before the board order goes in.

Not every item applies to every board, so skip what does not fit, but decide that deliberately. Record each finding with a decision: fixed, accepted, or deferred, and why.

0 of 75 checked

Ticks are saved in this browser only. To keep a record, use the print button to print or save a PDF: it includes your ticks.

1Requirements and architecture

2Power

3Schematic and parts

4Protection and connectors

5Clocks and signals

6RF and antenna

7Layout and stackup

8EMC

9Thermal

10DFM and assembly

11Test and bring-up access

12Documentation and release

Have a project in mind?

Based in southern Indiana. Working with clients anywhere.