The last 20 percent of a hardware product
The last 20 percent of a hardware product is everything between a prototype that works and a product that works every time, for everyone, when someone else builds it: the edge cases, verification and production test, getting ready for a factory, making the pieces work together, compliance, and the small human details nothing in the schematic asks for. It’s usually most of the calendar.
There’s a point in most hardware projects where the prototype works, the demo goes well, and everyone agrees it’s about 80 percent done. That estimate is usually right about the design and wrong about the schedule. It used to take a team months to get there. With AI tools, a founder or a two-person team can get there in weeks, which is a real change and I’m glad of it. But the tools moved the first 80 percent. The last 20 is the same size it always was, and now it arrives sooner, often at a team that has never done it before. A list is easier to work through than a feeling that something’s missing, so here’s what’s in it.
Why the last part is different
The first 80 percent answers one question: can this work? One board, on a bench, in a warm room, powered from a supply, operated by the person who designed it. If it works there, the answer is yes.
The last 20 percent answers a different question: will it work every time, for everyone, when built by someone else? That’s a question about the worst case, not the typical one, and it can’t be answered at a desk, which is why tools that live at a desk aren’t much help with it.
Edge cases
A prototype gets tested doing what it was designed for. The product will meet everything else:
- Power that comes up slowly, drops out for a moment, or arrives backwards.
- A battery that’s nearly flat, or cold, or both.
- A cable plugged in while the product is running, by someone who just walked across a carpet.
- A button held too long, pressed twice, or pressed during startup.
- A firmware update interrupted halfway.
- The tenth unit, whose parts are all within tolerance and all at the wrong end of it.
- The second year, when the flash has been written many times and the battery has aged.
Each of these happens in the first month of shipping. The work is to list them, decide what the product should do in each case, and then go and make each one happen on the bench.
Test, in two senses
Verification. For each requirement, a test that would fail if the requirement weren’t met. It sounds obvious, but many prototypes have been shown to work and never shown to meet anything, because the requirements were never written as numbers.
Production test. Every unit that leaves the factory has to be checked, quickly, by someone who didn’t design it. That needs test points on the board, a fixture, a test mode in the firmware, and limits that catch real faults without failing good units. It’s cheap to design in before layout and expensive after. Designing for production test goes through it.
I’d put a test strategy ahead of almost anything else on this list. A design with a mistake and a good test plan gets fixed. A design with a mistake and no test plan gets shipped.
Production readiness
A contract manufacturer builds exactly what the files say, including the errors. Getting ready for that means:
- A bill of materials with exact part numbers, approved alternates, and parts that can be bought in the quantity you need, this year and next.
- A board designed for the assembly process: panel, fiducials, clearances, and footprints checked against the parts.
- A package that’s complete and agrees with itself. What a complete manufacturing package includes has the list.
- A first build small enough to learn from. From prototype to production explains the stages.
Integration
Most of the problems I get called about aren’t in one part of the design. They’re between two parts that each worked.
The board works, and the enclosure detunes the antenna. The firmware works, and the regulator isn’t ready when it starts. The sensor works, and the motor next to it doesn’t let it. The charger works, and the case has nowhere for the heat to go.
The only way to find these is to put the real pieces together early, even when they’re rough. A 3D-printed enclosure and a hand-built cable will turn up most of them.
Compliance
Approvals are part of the last 20 percent whether or not they’re in the plan. The markets, the radios and the power source decide what’s required, and choices made in layout decide how hard the testing will be. An early scan at a test lab costs a small fraction of a failed formal test. Start with Plan for compliance from day one and the compliance planner.
The human details
No design tool produces this part, because nothing in the schematic asks for it.
- What does the light do while charging, when charged, and when something’s wrong? Can a color-blind person tell?
- What happens in the first minute out of the box, before anything is paired or configured?
- When it fails, does it say so, or does it just sit there?
- How does a customer get it back to a known state without calling anyone?
- Does the button feel deliberate? Does the connector go in the first time?
- What’s printed on the label, and is it what the regulations require?
Each item is simple, but together they take real time, and they’re most of the difference between a product people trust and one they put up with. It’s also where having shipped things before helps the most, because the list comes from having been caught by each item once.
Where AI tools help
I use AI tools every day, including on this kind of work. They’re good at drafting a test plan from a requirements list, turning a schematic into a first list of edge cases, checking a bill of materials for parts that are going out of production, and writing the documentation nobody wants to write. They don’t know what your enclosure does to your antenna, what your contract manufacturer’s process can hold, or what happened the last time someone shipped a product without a watchdog, and they won’t tell you what’s missing. Designing hardware with AI has more on that.
How to tell where you are
A rough test. For your design, can someone on the team answer these without guessing?
- What are the requirements, as numbers?
- Which of them have been tested, on how many units?
- What happens when power is removed at the worst moment?
- How will every unit be tested at the factory, and how long will it take?
- Which approvals are needed for the first market, and has anything been scanned?
- Can every part be bought in production quantity, and what replaces it if not?
- Which parts of the design were checked against a datasheet, and which were only generated?
If you can answer most of them, you’re closer than 80 percent. If most are “not yet”, that’s normal for a working prototype, and the list above is the plan.
Getting it done
Some teams do the last 20 percent themselves, and the checklists in Tools are there to help. Others want an engineer to review the design and hand back a ranked list, or to do the work alongside them, whether or not AI tools started it.
If you’d like to talk through where yours stands, get in touch.