Articles

Hiring a freelance hardware engineer: what to settle before you start

Before a freelance engineer starts on your product, settle six things in writing: which stage you’re buying, who does each part of the work, what you receive at the end (in formats you can change), who owns it, where you review the design before money goes to boards, and what happens when something goes wrong, whether that’s a design error, a change of mind, or a project that stops early. They cost little to agree at the start and a lot to sort out later.

There’s a printable version, with more detail, in the checklist for hiring a hardware design firm.

Know which stage you’re buying

“Build my product” can mean three different jobs: a feasibility study, a working prototype, or a design that’s ready for a factory. Each needs a different amount of work, and two quotes are only comparable if they’re for the same stage.

Before you ask for quotes, write down what the product is for, who uses it, the target cost and volume, where it’ll be sold, and the constraints that can’t move: size, battery life, launch date, budget. One page is enough. Without it the engineer has to guess, and you’ve got nothing to check the result against.

Ask who does each part

A product needs a circuit board, the firmware that runs on it, and usually an enclosure. It’s tempting to look for one person to do all of it. Ask plainly which parts they do themselves and which they pass to someone else, who that is, and who answers for the result.

Talk to the person who’ll do the work, not only the one who sells it. Ask to see past work in whatever form their NDAs allow, or to speak to a past client.

Decide what you’ll hold at the end

This decides whether you can ever change engineers, so settle it before work starts.

  • Design files in native formats. The schematic and layout in the files of the CAD tool used, with the part libraries, not only PDFs and Gerbers. Without them, the next engineer has to redraw the design to change it.
  • Firmware source and build instructions. Enough for someone else to build the same binary.
  • A manufacturing package. The files a factory needs, including the programming files. What a complete manufacturing package includes lists them.
  • Ownership. The contract should assign you the designs, code and documents made for you, and say when ownership passes, such as on payment. If the engineer reuses their own earlier designs or code, those should be named and licensed to you so that you can build, sell and change the product.
  • Third-party software. A list of the open-source code and vendor libraries in the firmware, with their license terms.

If I could only settle one of these up front, it’d be the native files. Without them, a change of engineer starts with a redraw.

Agree how money and mistakes work

Settle the pricing model, whether that’s a fixed price per phase, time and materials, or a retainer, and what happens when an estimate runs over. Ask whether prototype boards, parts, lab fees and certification are inside the price.

Ask how many board spins are planned. I’d be wary of a plan with one spin and no slack, because it leaves no room for the fixes that bring-up turns up. Agree who pays to fix design errors, as distinct from changes you ask for, and what you receive if the project stops early: the work so far, in native formats, for what you’ve paid.

Stay in the loop

Put review points in the plan where you see and approve the design before money goes to boards or tooling. Ask for regular progress reports and access to the work in progress. Changes to the scope should come with a cost and a schedule before the work starts.

Someone on your side has to own the project and make decisions quickly. A design review by an engineer who didn’t do the design is worth planning for; What I look for in a hardware design review describes one.

Decide how much distance matters

Most design work can be done remotely: schematics, layout, firmware and reviews all travel well as files and calls. Some of it goes better in the same room, such as the first power-up of a new board, a session at a test lab, or a visit to the factory before the first build. Ask how the engineer handles those days, who travels, and who pays for it. I work from southern Indiana, mostly remotely, with companies in the Midwest and well beyond it, and I travel when a project needs it.

Look past the prototype

A working prototype is the first goal. Ask early how the engineer plans for what comes after it: the factory that will build the product, for the approvals your markets need, for parts that will still be available, and for testing every unit in production. Ask what the handover looks like when the project ends. The last 20 percent of a hardware product covers what that later work involves.

If you have a proposal in hand and would like a second opinion before you sign, get in touch.