1 Your own homework2 Fit and experience3 Scope and deliverables4 Ownership and confidentiality5 Process and communication6 Cost and schedule7 Toward production
Project
Revision
Reviewed by
Date 1 Your own homework1.1 The product's purpose, users, target cost, volumes, and markets are written down, even roughly. 1.2 You know which stage you are buying: a feasibility study, a working prototype, or a design ready for production.Each stage needs a different amount of work, and proposals are only comparable for the same stage. 1.3 The fixed constraints are listed: size, battery life, enclosure, certifications, launch date, and budget. 1.4 Someone on your side owns the project and can make decisions quickly. 2 Fit and experience2.1 The firm has done work close to yours, such as similar radios, power sources, volumes, or markets. 2.2 The firm has the capacity to start when you need it and to keep your project staffed through the schedule, alongside its other work. 2.3 You have talked with the engineers who will do the work, not only the sales contact. 2.4 You know who does the work, whether staff, contractors, or a partner overseas, and who answers for it. 2.5 Past work is shown in whatever form its NDAs allow, or past clients are offered as references. 3 Scope and deliverables3.1 The proposal lists the deliverables: requirements, schematics, layout, BOM, firmware source and build instructions, test plan, and a manufacturing package with programming files. 3.2 Design files are delivered in the native formats of the CAD tools used, with part libraries, stackup, and design rules, not only as PDFs and Gerbers.Without them, the next engineer has to redraw the design to change it. 3.3 What counts as done is written down for each phase, such as boards brought up and tested against the requirements. 3.4 Assumptions and exclusions are listed, such as enclosure design, certification testing, production test fixtures, and app or cloud software. 4 Ownership and confidentiality4.1 The contract assigns you ownership of the designs, source code, and documents produced for you, and says when ownership passes, such as on payment. 4.2 Any of the firm's own reused designs or code is named, with a perpetual, irrevocable, royalty-free license that lets you build, sell, and change the product, and that passes to a buyer if your company is sold. 4.3 Third-party software in the firmware, including open-source code and vendor SDKs, is listed with its license terms.Some open-source licenses, such as the GPL, can require you to publish your own code if it is combined with theirs and shipped. 4.4 An NDA is in place before you share details, and it covers anyone the firm brings in. 6 Cost and schedule6.1 The pricing model is clear, whether fixed price per phase, time and materials, or a retainer, and so is what happens when an estimate runs over. 6.2 You know which costs the price includes: prototype boards, parts, test equipment, lab fees, and certification. 6.3 The schedule shows lead times for boards and parts and the number of board spins planned.A plan with one spin and no slack leaves no room for the fixes bring-up usually turns up. 6.4 The contract says who pays to fix design errors found at bring-up, as distinct from changes you ask for. 6.5 If the project stops early, you receive the work done so far, in native formats, for what you have paid. Next step Schematic and layout review checklist→ What to check in a schematic and board layout before you order boards: power, parts, clocks, RF, layout, EMC, thermal, DFM, test access, and release.