Project
Revision
Reviewed by
Date 1 Before you ask for quotes1.1 Volumes are written down: units per build, expected annual volume, and how firm each number is.Manufacturers price and plan around volume, and a quote for 500 units says little about the price at 5,000. 1.2 You know what you are buying: board assembly only, box build, programming and test, packaging, or shipping to customers. 1.3 You know who buys the parts: the manufacturer for every part (turnkey), you for every part (consigned), or a mix. 1.4 The quote package is complete and at one revision, with the BOM, board data, assembly drawing, and quantities, and every manufacturer gets the same package.Quotes from an incomplete package carry hidden assumptions, and two manufacturers end up quoting different products. 1.5 An NDA is in place before the package goes out, and it covers anyone the manufacturer shares it with. 1.6 Your cost estimate includes each connector's mating half, cable or harness, and any tooling they need, with their lead times.They are often among the most expensive and slowest parts to get, and the easiest to leave out. 2 Fit2.1 The manufacturer builds products like yours at your volumes, wants a project your size, and can grow with you, or you know where production goes if you outgrow it.A small project at a large manufacturer can wait behind bigger customers. 2.2 It has the processes your design needs, such as fine-pitch or BGA parts, X-ray inspection, conformal coating, RF test, or secure provisioning of keys, and a solder and cleaning process your parts can take.Some parts, such as open-cavity sensors and microphones, are ruined by a wash process. 2.3 It holds the quality certifications your market expects, such as ISO 9001, ISO 13485 for medical devices, IATF 16949 for automotive, or AS9100 for aerospace.Check that each certificate is current and covers the site that will build your product. 2.4 No assembly, test, or special process is subcontracted to another site without your approval. 2.5 Location, time zone, language, and shipping and import costs suit how closely you need to work with it. 2.6 You, or someone you trust, have visited the shortlisted manufacturer, seen the line your product would run on, and talked with customers of a similar size. 3 The quote3.1 One-time costs are listed apart from the unit price: setup, stencils, programming, fixtures, and first article inspection. 3.2 Part costs show how they are priced, including any markup, and what is assumed for parts with no quoted price. 3.3 Part overage is addressed: the extra parts the line uses in setup and attrition, minimum order quantities, who pays for the excess, and who owns it after the build.A reel bought for ten boards is often charged in full, and a consigned kit counted exactly can stop the line over one resistor. 3.4 Lead time is split into parts, assembly, and test, with the parts that set it named. 3.5 The quote lists its assumptions, exclusions, and payment terms, including any deposit for parts, and how long the prices hold. 3.6 Quotes are compared on total cost at your volume: unit price, one-time costs spread over the volume, excess parts, test, shipping, and duties. 6 Quality and test6.1 The IPC-A-610 acceptance class is agreed, along with the inspection used, such as AOI on every board and X-ray for BGAs and other hidden joints.Class 2 suits most products; Class 3 costs more and is for products that must not fail in service. 6.2 The test strategy is agreed: what the manufacturer tests, with which fixture, and to which limits. 6.3 Test results are logged for every serial number, you get the logs, and every build comes with a yield and defect report.When yield drops or a unit comes back from the field, those records are how you find out why. 6.4 Failed units have an agreed path: who analyzes them, who pays for repair or scrap, and how corrective actions are reported. 6.5 The flux and cleaning process are agreed, no-clean or washed, and suit any conformal coating and high-impedance circuits on the board.Residue left under voltage and humidity can grow conductive paths that leak or short. 7 Ownership and terms7.1 The agreement lists the fixtures, stencils, and programming hardware you pay for as customer-owned, and you hold the design files and software for them.Paying a tooling charge does not always make the tooling yours. Without it, moving production or fixing the test means starting over. 7.2 The agreement covers engineering changes: how they are priced and scheduled, and what happens to stock and units in progress. 7.3 A workmanship warranty is in writing: how long it lasts, and who pays for rework, scrap, and field returns caused by assembly errors, parts included.Standard terms often limit the manufacturer to the cost of its own labor, leaving you to pay for the parts on scrapped boards. 7.4 You know how you would leave: how fixtures, inventory, and files come back to you if you move production. Next step EVT, DVT, and PVT exit checklist→ What each hardware build should prove before the next: planning, EVT, DVT, and PVT exit criteria, design freeze, and the review after every build.