Ticks are saved in this browser only. To keep a record, use the print button to print or save a PDF: it includes your ticks.
1 Before EVT2 Planning each build3 EVT exit4 DVT build5 DVT exit6 PVT build7 PVT exit8 After every build
Project
Revision
Reviewed by
Date 1 Before EVT1.1 Requirements are written down: what the product must do, where it will be sold, and how it will be used. 1.2 The riskiest parts of the architecture have been tried on prototypes or development kits. 1.3 The main parts are chosen, with availability, lead time, lifecycle status, and second sources checked. 1.4 If a contract manufacturer is chosen, it has reviewed the design for part choices, panelization, and test access.Their feedback is cheapest to act on before layout is settled. 1.5 The boards have debug access, test points, and current-measurement points for bring-up, with room kept for production test points and a firmware test mode. 1.6 A use profile is written down, covering hours of use, temperatures inside the enclosure, thermal cycles, humidity, vibration, and how often connectors are plugged, and life estimates and reliability tests are taken from it. 1.7 The service life is stated, and every part that wears out, such as the battery, electrolytic capacitors, connectors, switches, relays, fans, and flash memory, is rated for it under the use profile.An electrolytic capacitor beside a hot part, a counter written to flash every second, or a connector plugged in at every test station can wear out well inside the product's life. 2 Planning each build2.1 The question the build must answer, and its exit criteria, are written down before the build is ordered. 2.2 Unit counts cover every use: testing, firmware, certification, reliability units that will be destroyed, and demos.Too few units means a second, small, expensive run. 2.3 Long-lead parts, fixtures, and any tooling the build needs are ordered early enough for the build date. 2.4 Each unit has a serial number, and its hardware revision, firmware version, and any rework are recorded. 2.5 The test plan lists who tests what, on which units, and where the results are kept. 3 EVT exit3.1 Every function and interface has been demonstrated on the custom boards.The first board bring-up checklist covers the first power-on and the checks after it. 3.2 Power is measured against the requirements in every operating mode, including sleep and off. 3.3 Firmware runs on the real hardware, with test modes for certification and production test. 3.4 Early compliance checks are done: near-field scans and ESD on the bench, with fixes carried into the design. 3.5 Major bugs are fixed, or understood with a planned fix. 3.6 The mechanical design is stable enough to order production tooling, after a manufacturability review with the toolmaker.Tooling takes weeks to build and several rounds of trial shots to adjust. 3.7 A tolerance stack shows that connectors, buttons, light pipes, displays, and stacked boards fit their openings and mates at worst case, not only at nominal.Stacking connectors are also checked for gender, mated height, and keying against a rotated or mirrored mate. 3.8 Connectors that take mating force or cable pull are held by more than their solder joints, and cables soldered or plugged to the board have strain relief. 5 DVT exit5.1 Reliability and environmental tests pass, or the fixes are known and verified, with tests chosen to match how the product is used: temperature, humidity, drop, vibration, and wear.For outdoor products, include time in real sun. 5.2 The product starts up at each temperature extreme, not only runs through the range.Powering on warm and then cooling proves the product runs cold, not that it starts cold. 5.3 Battery life, thermal behavior, and radio performance are measured in the final enclosure. 5.4 Pre-compliance passes at a lab, and formal certification testing is under way or done on units that represent production. 5.5 Parts from the tools are inspected against the drawings, and cosmetics and fit are approved. 5.6 Assembly defects from the build are reviewed with the assembler, and design-side causes are fixed. 5.7 The design is frozen, and any change after this point goes through a written change process.Each change is checked against tooling, certification, and the factory instructions; late mechanical changes are kept steel-safe, so the toolmaker removes metal rather than adding it. 5.8 Battery life still meets the requirement with the cell at its end-of-life capacity, after the charge cycles and temperatures of the use profile.A lower charge voltage trades some runtime for a longer cycle life. 5.9 In a sealed product every opening, including connectors mated and unmated, is covered by the sealing plan, and there is a plan for condensation, such as a membrane vent.A sealed enclosure breathes as it heats and cools, so an ingress rating alone does not keep moisture out. 6 PVT build6.1 Units are built on the production line by trained operators, using production tooling, fixtures, assembly instructions, and packaging. 6.2 Units are programmed with released production firmware through the line's own process, including any unique IDs and keys. 6.3 Work instructions for each station, and inspection criteria for incoming parts, the line, and finished units, are agreed with the contract manufacturer. 6.4 Labels, regulatory marks, and the manual are final, and certification is complete before any unit is sold.PVT units are often the first ones sold. Next step Release to manufacturing checklist→ What to include and confirm before releasing a design to a board fab and contract manufacturer: data, BOM, programming, test, labels, and revisions.