EVT, DVT, and PVT exit checklist

What to confirm before leaving each build on the way from prototype to production, for teams running their own builds. Each stage answers one question: does the design work, does it hold up, and can the factory build it repeatedly.

Small teams often merge stages or use a pilot run in place of PVT. That works if the merged build still answers every question; check the items for each stage either way.

0 of 46 checked

Ticks are saved in this browser only. To keep a record, use the print button to print or save a PDF: it includes your ticks.

1Before EVT

2Planning each build

3EVT exit

4DVT build

5DVT exit

6PVT build

7PVT exit

8After every build